Location: | Greenwich |
Client: | GB Building Solutions |
Contract Duration: | 3 weeks |
Located in one of the most prestigious areas of London, GB are constructing a luxury nine-storey, residential block of 161 flats at The Greenwich Peninsula development.
Chosen because of our previous work in this area for GB, as a trusted contractor, we were employed to supply the fit-out of a mock up apartment. Our works included carpentry, flooring, painting and tiling.
Careful planning and coordination by our Surveyor and on site Management Team ensured that we met the three week timescale allocated to us by the client, presenting them with a high quality final product.
Project features
– Gradus bathroom tiles
– Hardwood flooring
– Stained oak veneered doors